Realization of Construction of Firehouse in Ždírec nad Doubravou
Kazda, Jiří ; Bříza, Lukáš (referee) ; Mohapl, Martin (advisor)
The master´s thesis describes the realization of new building of fire station in Ždírec nad Doubravou. The parts of the thesis are time and financial plan for all building objects, assessment of transport routes, design of site equipment and design of main machines. An itimized budget with a bill of quantities and a detailed construction schedule are prepared for the main building. A technological regulativ and quality control plan are prepared for the stage of industrial steelconcrete floor. In the end of the work, there is solved the noise study of construction and the topic of system infiltration tanks.
Newly-built multipurpose building in Boskovice, execution of superstructure.
Sojka, Petr ; Nečasová, Barbora (referee) ; Kovářová, Barbora (advisor)
The theme of my bachelor thesis is processing technology of rough superstructure of new multi-building owned by Lamex. This is partly double-deck building consisting of storage, administrative and retail space. The subject of my work is processing technology prescription for construction of precast concrete frame and construction of steel fibre reinforced concrete floor. The other parts of this thesis, which with focused on rough superstructure are technical report, construction plan, budget with statement of merit, time schedule, wokers‘ balance, site equipment, safety of workers.
Storage hall No. 2 in Rousínov - construction-technological project
Gottvaldová, Denisa ; Valenta, Michal (referee) ; Biely, Boris (advisor)
The subject of my diploma thesis is a construction-technological solution for realization of a storage hall in Rousínov. The work deals with a time and financial plan for all buildings of the project Storage Hall, Rousínov. A technical report, a study of the implementation of the construction’s individual stages, a design and assessment of transport routes, a design of the construction site equipment and a design of the machinery were prepared for the building No. 2. An itemized budget with a statement of acreage and construction schedule was prepared. A technological regulation and a control and test plan were prepared for the implementation process of the wire-reinforced concrete industrial floor. Within the diploma thesis, a technological regulation for the implementation of a reinforced concrete retaining wall was prepared. Noise pollution caused by the construction site was examined and evaluated in a noise study. The environmental requirements for the storage hall building No. 2 were processed.
Implementation of Production Hall in Hulín
Holba, Petr ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
The topic of the diploma thesis is a solution of the construction and a technological project of a production hall in Hulín. The thesis consists of an accompanying and a summary technical report, a study of the main technological stages implementation, a coordination situation of the construction with the closer transport relations, a solution of wider transport route relationships including a proposal of the building supply and an oversized transport solution, an object time schedule and a financial plan of the construction including the staff balance, a time schedule for the selected processes of the main building object, a design of the main building machines including an assessment of a lifting mechanism, a technological regulation for assembling of a prefabricated skeleton including a health and a safety plan, a technological regulation for a wire-concrete floor realization including a quality control and a health and a safety plan, a project of site equipment, a control and a test plan for prefabricated skeleton assembly. And also a budget item for selected technological processes, an assembly scheme for the prefabricated skeleton and a schemes´composition of the wire-concrete floor.
Implementation of Production Hall in Holešov
Ševela, Ondřej ; Venkrbec, Václav (referee) ; Nečasová, Barbora (advisor)
The diploma work has been dealing with the building and technological design of a production hall in Holešov. The work includes the general and specification report, the study of main technological phases, the site plan, the technological specification solving the transportation relations and coordination of oversize transportation, time and financial schedule of the construction, material supply plan including staff review, the time schedule for pre-cast frame assembly, machinery plan including the time employment, the site plan including the drawings, technological specification of pre-cast frame assembly and of steel-fibre-reinforced floor, inspection and test plan of pre-cast concrete frame assembly, assessment of lifting mechanism, the procedure scheme of pre-cast concrete frame assembly and the cost estimate of pre-cast concrete frame.
Construction preparation of production and administrative building in Moravany
Veselý, Martin ; Brandtner, Michal (referee) ; Venkrbec, Václav (advisor)
The diploma thesis deals with the elaboration of a building-technological project for the construction of a hall in Moravany u Brna. The work includes comprehensive studies of implementation including timetable, financial plans and technological regulations. It also deals with the design of the main building mechanisms, building equipment, control and test plan. There are also three drawings of the construction site equipment for the implementation stages.
Storage hall No. 2 in Rousínov - construction-technological project
Gottvaldová, Denisa ; Valenta, Michal (referee) ; Biely, Boris (advisor)
The subject of my diploma thesis is a construction-technological solution for realization of a storage hall in Rousínov. The work deals with a time and financial plan for all buildings of the project Storage Hall, Rousínov. A technical report, a study of the implementation of the construction’s individual stages, a design and assessment of transport routes, a design of the construction site equipment and a design of the machinery were prepared for the building No. 2. An itemized budget with a statement of acreage and construction schedule was prepared. A technological regulation and a control and test plan were prepared for the implementation process of the wire-reinforced concrete industrial floor. Within the diploma thesis, a technological regulation for the implementation of a reinforced concrete retaining wall was prepared. Noise pollution caused by the construction site was examined and evaluated in a noise study. The environmental requirements for the storage hall building No. 2 were processed.
Realization of Construction of Firehouse in Ždírec nad Doubravou
Kazda, Jiří ; Bříza, Lukáš (referee) ; Mohapl, Martin (advisor)
The master´s thesis describes the realization of new building of fire station in Ždírec nad Doubravou. The parts of the thesis are time and financial plan for all building objects, assessment of transport routes, design of site equipment and design of main machines. An itimized budget with a bill of quantities and a detailed construction schedule are prepared for the main building. A technological regulativ and quality control plan are prepared for the stage of industrial steelconcrete floor. In the end of the work, there is solved the noise study of construction and the topic of system infiltration tanks.
Construction preparation of production and administrative building in Moravany
Veselý, Martin ; Brandtner, Michal (referee) ; Venkrbec, Václav (advisor)
The diploma thesis deals with the elaboration of a building-technological project for the construction of a hall in Moravany u Brna. The work includes comprehensive studies of implementation including timetable, financial plans and technological regulations. It also deals with the design of the main building mechanisms, building equipment, control and test plan. There are also three drawings of the construction site equipment for the implementation stages.
Implementation of Production Hall in Holešov
Ševela, Ondřej ; Venkrbec, Václav (referee) ; Nečasová, Barbora (advisor)
The diploma work has been dealing with the building and technological design of a production hall in Holešov. The work includes the general and specification report, the study of main technological phases, the site plan, the technological specification solving the transportation relations and coordination of oversize transportation, time and financial schedule of the construction, material supply plan including staff review, the time schedule for pre-cast frame assembly, machinery plan including the time employment, the site plan including the drawings, technological specification of pre-cast frame assembly and of steel-fibre-reinforced floor, inspection and test plan of pre-cast concrete frame assembly, assessment of lifting mechanism, the procedure scheme of pre-cast concrete frame assembly and the cost estimate of pre-cast concrete frame.

National Repository of Grey Literature : 12 records found   1 - 10next  jump to record: